So today in a frantic rush between calls, I removed the offending heater panel, and made up a new one. I even remade the curved section, which turned out better than the last one so winner. Please don’t message telling me the mounting flange for the gearbox tunnel vanity panel is too wide - I’ve since cut it down
Here it is spotted in place, and more importantly with both floor mounting tabs level with the bottoms of the footwells:
There are, as always - plenty of finishing jobs to do. There are a few areas where the spot welder wouldn’t reach - but I can get in there with the MIG over the weekend and sort them out. Also, the new heater panel needs cutting in on one side, but that’s a job for when some new 1mm discs arrive.
Anyway, that’s all from me today as I’m off to return Howard’s welder, and perhaps more importantly - sample some Hertfordshire beer
All the best,
Andy