Drilled holes for indicator wiring, headlight dim/dip switch and associated wiring. Touched up these and the hole for the brake stop switch wires and then fitted the wires. Tested the flasher unit and completed the indicator wiring. Fitted the headlight dim/dip switch to the floor.
The instrument panel went backwards today as I stripped it down, but at least Fred will be pleased…having looked at my satin instrument panels beside the gloss black bits, I have re-painted the instrument panels gloss black.
I fitted the last remaining bump stop.
That just leaves fastening the loom to the bulkhead at various points, crimping connectors at the terminal box end (can’t find the transparent terminals I bought), fitting the regulator box (awaiting longer 10UNF bolts) and connecting up the newly repainted centre dash.
I will also fit the dash panel, petrol tanks and tighten up the suspension bolts. Question is what is the next major job to start? Engine, gearbox or rear tub ???

- IMG_4006.JPG (969.11 KiB) Viewed 1682 times

- IMG_4007.JPG (1019.44 KiB) Viewed 1682 times