One or two of you have asked me to say something about my “other” project – the one which has taken my eye, temporarily, off the Land Rover ball. I’m not going to make this a big thread, nor wil I update it at every turn as I did with 23HF14, but, by way of a diversion, I will run this blog on an occasional basis until it is finished. If, however, it is thought entirely inappropriate, then, of course, the moderators are free to delete it and I shall stop there! I don’t want to bore anyone and certainly don’t wish to distract from the core purpose of the site – the military Lightweight.
When we retired, Freda and I decided to put aside a sum of money each for a project. I made up my mind and spent mine straight away – 23HF14 being the result. Freda has waited, but finally, a couple of months ago she decided “I want a shepherd’s hut”. So, that is what she shall have!
Within a day or two, I had bought the basics from a chap in Yorkshire. He gave me an excellent deal, provided I made up my mind within 48 hours. I could then also have free delivery as he was coming to the Brecon Beacons on holiday and could bring it with him.
So, I ordered a chassis with oak axles and the basic frame of a 16’ x 7’6” shepherd’s hut. It worked out a lot cheaper for me to buy these than it would have been for me to build them from scratch. I also ordered the domed corrugated galvanised iron (CGI) roof at the same time. And, it arrived on an enormous trailer behind (of course) his Land Rover. Ideally, he would have followed the A40 until the final 7 miles of C class road, but, he followed his satnav and the shortest route. Not a great idea as it is along some very twisting and narrow lanes. Funnily enough, while navigating said lanes he met a chap with a low-loader delivering a tower crane to the HEP project currently underway in the valley – he too was following a satnav and in even greater predicament than the shepherd’s hut man!
But, it arrived, eventually, with the rueful comments that delivery would not have been free had he known where we live! Too late!
The first thing was to manoeuvre the hut chassis into place in the garden – using the Freelander. I’d have used the Lightweight, had it been running properly and had it had a better turning circle.
Once it was in place, I fitted a thick plywood floor, which had been waterproofed with bitumen, on which to build the frame.
With the frame in place I covered the outside walls with plywood and covered them and the roof with a breathable, waterproof membrane. We then fitted the CGI roof which wasn’t easy given that it was now some 12 feet off the ground and the individual bowed sheets of CGI were both awkward and heavy. Freda was up the ladder, I passed each sheet up to her, she held it still until I then climbed up an adjacent ladder and, between us, we wriggled the sheets over the roof and teck-bolted them down. That was a bit of a bind, as well as the teck-bolts wouldn’t self tap as they should have done so each needed a drilled pilot hole.
The next job was fitting electric wiring for a ring main and lighting circuit. I used a small garage consumer unit and caravan power inlet socket. We don’t intend to use the electricity, but, who knows what we may need in the future, so it is better to have the wiring and sockets in place now, than try and fit them later when all the cladding and insulation is in place. We have HPP lamps for lighting and a wood-burning stove to keep it warm.
With the electrics done I was free to fit an OSB floor. This was 4” proud of the original floor with the gap insulated with fleeces from local sheep. On top of this there will be oak laminate flooring which I managed to pick up locally – enough for the job for just £40, which was pleasing. I found the advert in the local free magazine.
Yesterday, Freda and I went to Leominster to an architectural salvage yard where we found a matching pair of galvanised steel windows which are ideal and I spent today removing the glass and cleaning them up prior to re-fitting what panes I can plus more I shall have to buy in town to replace the broken ones.
In the background, I have been priming the matchboard interior cladding which will go over more fleece insulation and a special membrane designed to reduce the heat inside from the sun as well as keeping it warm in the winter. With the hut having CGI roof and walls, this is important if it is to be at all comfortable in the summer. I still have 120 planks to go!
At one end there will be a double bed and I have bought the mattress and lathes for that. It will be built in with cupboards beneath. At the other end, on a small plinth, will be a wood-burning stove beside a table and chair with a pair of armchairs in the middle of the hut and shelves for books on the walls. Above the bed I will fit a small stained-glass window which I found in a local antique shop. I still need to make a door – probably a stable door with a window in the upper half as the hut will need as much light as I can get.
More to follow, in due course, including photos of the hut itself.
When we retired, Freda and I decided to put aside a sum of money each for a project. I made up my mind and spent mine straight away – 23HF14 being the result. Freda has waited, but finally, a couple of months ago she decided “I want a shepherd’s hut”. So, that is what she shall have!
Within a day or two, I had bought the basics from a chap in Yorkshire. He gave me an excellent deal, provided I made up my mind within 48 hours. I could then also have free delivery as he was coming to the Brecon Beacons on holiday and could bring it with him.
So, I ordered a chassis with oak axles and the basic frame of a 16’ x 7’6” shepherd’s hut. It worked out a lot cheaper for me to buy these than it would have been for me to build them from scratch. I also ordered the domed corrugated galvanised iron (CGI) roof at the same time. And, it arrived on an enormous trailer behind (of course) his Land Rover. Ideally, he would have followed the A40 until the final 7 miles of C class road, but, he followed his satnav and the shortest route. Not a great idea as it is along some very twisting and narrow lanes. Funnily enough, while navigating said lanes he met a chap with a low-loader delivering a tower crane to the HEP project currently underway in the valley – he too was following a satnav and in even greater predicament than the shepherd’s hut man!
But, it arrived, eventually, with the rueful comments that delivery would not have been free had he known where we live! Too late!
The first thing was to manoeuvre the hut chassis into place in the garden – using the Freelander. I’d have used the Lightweight, had it been running properly and had it had a better turning circle.
Once it was in place, I fitted a thick plywood floor, which had been waterproofed with bitumen, on which to build the frame.
With the frame in place I covered the outside walls with plywood and covered them and the roof with a breathable, waterproof membrane. We then fitted the CGI roof which wasn’t easy given that it was now some 12 feet off the ground and the individual bowed sheets of CGI were both awkward and heavy. Freda was up the ladder, I passed each sheet up to her, she held it still until I then climbed up an adjacent ladder and, between us, we wriggled the sheets over the roof and teck-bolted them down. That was a bit of a bind, as well as the teck-bolts wouldn’t self tap as they should have done so each needed a drilled pilot hole.
The next job was fitting electric wiring for a ring main and lighting circuit. I used a small garage consumer unit and caravan power inlet socket. We don’t intend to use the electricity, but, who knows what we may need in the future, so it is better to have the wiring and sockets in place now, than try and fit them later when all the cladding and insulation is in place. We have HPP lamps for lighting and a wood-burning stove to keep it warm.
With the electrics done I was free to fit an OSB floor. This was 4” proud of the original floor with the gap insulated with fleeces from local sheep. On top of this there will be oak laminate flooring which I managed to pick up locally – enough for the job for just £40, which was pleasing. I found the advert in the local free magazine.
Yesterday, Freda and I went to Leominster to an architectural salvage yard where we found a matching pair of galvanised steel windows which are ideal and I spent today removing the glass and cleaning them up prior to re-fitting what panes I can plus more I shall have to buy in town to replace the broken ones.
In the background, I have been priming the matchboard interior cladding which will go over more fleece insulation and a special membrane designed to reduce the heat inside from the sun as well as keeping it warm in the winter. With the hut having CGI roof and walls, this is important if it is to be at all comfortable in the summer. I still have 120 planks to go!
At one end there will be a double bed and I have bought the mattress and lathes for that. It will be built in with cupboards beneath. At the other end, on a small plinth, will be a wood-burning stove beside a table and chair with a pair of armchairs in the middle of the hut and shelves for books on the walls. Above the bed I will fit a small stained-glass window which I found in a local antique shop. I still need to make a door – probably a stable door with a window in the upper half as the hut will need as much light as I can get.
More to follow, in due course, including photos of the hut itself.