So far I have got the following ready for my rebuild:
Richards galvy chassis, parabolics, gas shocks, rebuilt military axle, Ashcroft suffix D series gearbox with high ratio transfer box, new doors, new wiring loom, Ashtree galvy bulkhead, vent panel and windscreen frame.
I have a fully built 200Tdi engine from Turner Engineering and all new ancillaries to go back on except the fuel injection pump & injectors which are currently being reconditioned by Watkins Diesel.
Bodywork is having a complete overhaul as well. Mine was a typical bodge up with a series tailgate and 2a wings which for a 2a set up look wrong due to square corners. I have managed to get a new pair and bonnet shipped from Cyprus off a stored Lwt with 4K on the clock. Currently most body parts are down at the spray shop.
My rear tub was a state underneath so I decided to rebuilt it. I drilled out the rivets, cut the spot welds and took it back to every component part. I have since had a fabricators make each part new and I have to now work out how to fit it all back together.
Lots to do but I'm working on it all day Saturday's until it's done now.