85KA17 - due south

Tell us about any of your Land Rover related projects here.
User avatar
gunner59
Posts: 67
Joined: Sat Apr 28, 2018 12:42 pm

Re: 85KA17 - due south

Post by gunner59 » Mon Mar 02, 2020 9:18 am

I am pleased and relieved to be able to report that Gromit's 2.25 was started and run up briefly yesterday, before the seal on the glass bowl of the fuel pump decided to let air into the line - much cursing. Also have to admit to not having triple checked the tightness of the bolts holding the fan and hub assembly to the engine as this started to come loose.
But good news is, he fired on all 4 cylinders and wasn't at all lumpy. So now that I know it all works I can finally replace the contact points and finish the overhaul of the distributor.
This was also the first time that electrickery had been applied so again greatly relieved to find that the dash lit up and all switches for things connected up operated successfully. Also good to see that the brake fluid warning light came on as a result of there being no fluid present as yet.

So definitely into the final straight but quite how many hurdles remain to be jumped is as yet unclear
Attachments
IMG_2314_1_1.JPG
And now
IMG_2314_1_1.JPG (465.7 KiB) Viewed 4099 times
IMG_2127_5.JPG
Engine set up October 2018
IMG_2127_5.JPG (464.46 KiB) Viewed 4099 times
85KA17 - 1982 Lightweight GS, 50 Missile Regiment Royal Artillery BAOR

12KJ74 - 1990 Defender GS, 1/2/3/ Gurkha Rifles Hong Kong Garrison

Undated narrow track Sankey trailer, chassis plate stamped 1229RN

User avatar
Loulou
Pastry Chef
Posts: 570
Joined: Wed Jul 04, 2018 12:12 pm
Location: France

Re: 85KA17 - due south

Post by Loulou » Tue Mar 03, 2020 8:47 am

Congratulations and good luck for the future.
Come on ... let's hang on!

Looloo
27GJ77 - 1977 LWT SIII FFR - 1st. Royal Horse Artillery - B Battery (BAOR)

User avatar
gunner59
Posts: 67
Joined: Sat Apr 28, 2018 12:42 pm

Re: 85KA17 - due south

Post by gunner59 » Wed Mar 04, 2020 9:50 am

Merci beaucoup Loulou. Vos encouragements sont appréciés
85KA17 - 1982 Lightweight GS, 50 Missile Regiment Royal Artillery BAOR

12KJ74 - 1990 Defender GS, 1/2/3/ Gurkha Rifles Hong Kong Garrison

Undated narrow track Sankey trailer, chassis plate stamped 1229RN

User avatar
gunner59
Posts: 67
Joined: Sat Apr 28, 2018 12:42 pm

Re: 85KA17 - due south

Post by gunner59 » Sun Mar 08, 2020 6:26 am

Full engine start up and static test successfully completed with minimal coolant leaks, no unpleasant WTF was that type noises and no hot/burning odours from "somewhere" not as yet identified. Ran very sweetly considering I didn't use the strobe to set things up and the overhaul of the Weber etc. A little noisy on the tappets but that's easily fixed and heck, it's part of the 2.25 "charm".

One slight mishap yesterday in re-tightening the fan bolts, which had worked their way loose last week during the attempted start up - yes, you guessed it, I sheared one off - much swearing. But hey it doesn't take much to take the rad off again to get at it. And now that I've run the engine up to temp and the bypass joint doesn't leak/hasn't as yet - it will make re-painting that a whole lot easier.

So, another major milestone reached and nearly time for floors and seats. Luxury!
85KA17 - 1982 Lightweight GS, 50 Missile Regiment Royal Artillery BAOR

12KJ74 - 1990 Defender GS, 1/2/3/ Gurkha Rifles Hong Kong Garrison

Undated narrow track Sankey trailer, chassis plate stamped 1229RN

User avatar
gunner59
Posts: 67
Joined: Sat Apr 28, 2018 12:42 pm

Re: 85KA17 - due south

Post by gunner59 » Tue Mar 24, 2020 8:05 am

Another successful static engine test, cooling fan fixings replaced and iffy accelerator linkages sorted. Now heading into an initial 4 week COVID-19 lock down from 2359 tomorrow Wednesday 25th NZ time. Will be working from home for 3 weeks of that and have next week currently booked off as leave. However since the Level 4 has happened with limited notice not everything by way of parts and other materials for the non-Lightweight re-build DIY projects is in place yet. So a frantic rush round tomorrow, in between working, to try and get sorted. Otherwise, unless I can source stuff on-line and get it delivered, we're looking at the last week of April at the earliest to start acquiring. And seeing as how the intended debut event for Gromit to meet his adoring public has been cancelled (Warbirds over Wanaka) and similar events are unlikely to be happening for a good 6 months, I could now just chillax and go with the flow in terms of the rebuild.

On the other hand, having the excuse to go out to the garage for an hour or four, may just make 4 weeks of lockdown bearable and maintain relationships with certain significant other.
85KA17 - 1982 Lightweight GS, 50 Missile Regiment Royal Artillery BAOR

12KJ74 - 1990 Defender GS, 1/2/3/ Gurkha Rifles Hong Kong Garrison

Undated narrow track Sankey trailer, chassis plate stamped 1229RN

User avatar
gunner59
Posts: 67
Joined: Sat Apr 28, 2018 12:42 pm

Re: 85KA17 - due south

Post by gunner59 » Sun Jun 07, 2020 6:27 am

Greetings from a land down under, or on top, depending on your perspective. So an "interesting" April and May and all of a sudden here we are just two weeks away from the shortest day of the year.

No photos with this post due to me leaving it too late to take them and the lens fogging over due to the plummeting temperature in the garage. But a quick update on progress none the less as follows:

replacement seat belts fitted
rear bench seats overhauled and re-fitted
windscreen overhauled and re-fitted
tailgate overhauled and re-fitted
re-painting of inside of rear tub completed
85KA17 - 1982 Lightweight GS, 50 Missile Regiment Royal Artillery BAOR

12KJ74 - 1990 Defender GS, 1/2/3/ Gurkha Rifles Hong Kong Garrison

Undated narrow track Sankey trailer, chassis plate stamped 1229RN

User avatar
gunner59
Posts: 67
Joined: Sat Apr 28, 2018 12:42 pm

Re: 85KA17 - due south

Post by gunner59 » Tue Sep 15, 2020 11:46 am

Spring has now officially sprung out here (albeit currently taking a backward step today) so have been able to get some painting tasks underway i.e.
  • front bumper re-primed for top coating
    ditto for rear bumperettes (but only after removing several thick layers of the dreaded paint- silver)
    engine compartment inner wings
    lifting eyes and tow hook
And then various small, but sometimes time consuming tasks like:
  • fitting new choke cable and "persuading" the warning light cable mounted switch to work
    making sense of various PO's wiring on the instrument panel
    fitting replacement, correct hazard warning switch
    drilling out the top bolt holes for the rear lifting eyes
    sourcing and adapting external mounted aeriel support column to serve as pole mounted beacon
    and working through the process of elimination to ID what still needs doing with the steering
Still not sure what the summer season will bring in terms of event/shows, am guessing 6 months out from next year's big Warbirds event at Easter that things are still up in the air - pun intended. But the big South Island A&P show is definetely not on for this year. But will carry on regardless and least, everything firmly crossed, get 85KA17 road legal and humming shortly.
85KA17 - 1982 Lightweight GS, 50 Missile Regiment Royal Artillery BAOR

12KJ74 - 1990 Defender GS, 1/2/3/ Gurkha Rifles Hong Kong Garrison

Undated narrow track Sankey trailer, chassis plate stamped 1229RN

User avatar
gunner59
Posts: 67
Joined: Sat Apr 28, 2018 12:42 pm

Re: 85KA17 - due south

Post by gunner59 » Mon Feb 08, 2021 4:46 am

Finally, after a prolonged absence from the workshop due to other commitments, I've managed to spend a decent amount of time on young Gromit :D
More importantly today saw him moving under his own power for the first time since December 2018, nothing too taxing, just a gentle perambulation whilst listening out for any expensive noises and a a try out of clutch and brakes.
So far so good.
So this year's tasks to date include:
  • Clutch and brakes refilled and bled
    New starter solenoid and starter motor fitted - even with an overhaul the one Gromit came with was always struggling to do the job and in so doing was stuffing the battery
    Removed and refitted the rear springs - things had moved around a bit and the rear diff was leaning forwards slightly
  • Fitted new fuel tap switches
  • check, clean and repair the canvas tilt
  • draw up the pattern for the black and green camouflage - painting to be done once structurally and mechanically approved for road use
  • refit bottom sills, door tops
Still working through the process of elimination with the steering. Having replaced all the ball joints I still have the situation whereby the wheel turns about about 30 degrees each way and although the drop arm and longitudinal both move as soon as the wheel is turned there's a delay before the relay starts moving. Now given that the vehicle was fitted with a new OEM column and box within the past 20 years and has only done approx 50,000 miles in that time my money is on the relay. We shall see.
85KA17 - 1982 Lightweight GS, 50 Missile Regiment Royal Artillery BAOR

12KJ74 - 1990 Defender GS, 1/2/3/ Gurkha Rifles Hong Kong Garrison

Undated narrow track Sankey trailer, chassis plate stamped 1229RN

User avatar
Loulou
Pastry Chef
Posts: 570
Joined: Wed Jul 04, 2018 12:12 pm
Location: France

Re: 85KA17 - due south

Post by Loulou » Wed Feb 17, 2021 4:39 pm

Well that… the job is progressing.

For the steering, it's the same: bowl and new bearings, new ball joints everywhere and revised housing = the rotation of the steering wheel does not immediately attack the pivoting of the wheels ... There are so many linkages.

Old ladies always shake a little.

Regards.
Looloo.
27GJ77 - 1977 LWT SIII FFR - 1st. Royal Horse Artillery - B Battery (BAOR)

User avatar
gunner59
Posts: 67
Joined: Sat Apr 28, 2018 12:42 pm

Re: 85KA17 - due south

Post by gunner59 » Fri Jul 30, 2021 8:00 am

Finally got round to the front axle and steering etc etc. Which I'm hoping is the last big job left to do as winter is nearly over and it's Gromit's 40th next year so would be good to have him not just road legal but back to his BAOR glory days look as well by then. No pressure. The photos as always tell their own story i.e behind the one of all the component parts laid out after removal lies several hours of blood/sweat and tears (plus skin and hair) - sound familiar? Just the nearside swivel and housing on show so far. The old railko bush and lower bearing outer both drifted out with no real dramas and the replacements were similarly no big drama to install. But then with the best part of 40 years series LR ownership and maintenance behind me I should jolly well hope so.
Attachments
IMG_2689.JPG
IMG_2689.JPG (1.2 MiB) Viewed 2677 times
IMG_2688.JPG
IMG_2688.JPG (942.77 KiB) Viewed 2677 times
IMG_2687.JPG
IMG_2687.JPG (767.97 KiB) Viewed 2677 times
IMG_2686.JPG
IMG_2686.JPG (1.05 MiB) Viewed 2677 times
85KA17 - 1982 Lightweight GS, 50 Missile Regiment Royal Artillery BAOR

12KJ74 - 1990 Defender GS, 1/2/3/ Gurkha Rifles Hong Kong Garrison

Undated narrow track Sankey trailer, chassis plate stamped 1229RN

Post Reply