Re: My "other" project - the shepherd's hut
As promised, some photos. My goodness, it has been wet. All the streams around here are cascading down the hills, the river is fast, wide and brown with mud and the reservoir is running over the spillway. Add to that very high gusts of wind. Autumnal equinox weather!
This is how it is looking now I have glazed one of the windows and fitted the wriggly tin onto three sides. I still need to make doors and steps, as you can see!
Inside, I have painted most of the cladding and done the architrave round the windows and I am still waiting for the putty to dry before I clean the glass:
On the outside, there will be right-angle corner pieces to cover the wall joins. And, yes, I know some of the techbolts aren't level, but, doing this on your own means you are holding the sheet in place with one hand while using the driver with the other and trying not to let anything slip so judging exactly where the bolt should go in is tricky!
Inside, I have painted most of the cladding and done the architrave round the windows and I am still waiting for the putty to dry before I clean the glass:
On the outside, there will be right-angle corner pieces to cover the wall joins. And, yes, I know some of the techbolts aren't level, but, doing this on your own means you are holding the sheet in place with one hand while using the driver with the other and trying not to let anything slip so judging exactly where the bolt should go in is tricky!
Re: My "other" project - the shepherd's hut
Very nice how it gets ready more and more -
Not at least: next winter will come
I like it, Steve
Not at least: next winter will come
I like it, Steve
It's supposed to look like that, it's crochet...
- removeduser185
- Cake Guru
- Posts: 3531
- Joined: Thu Jun 18, 2015 10:37 pm
Re: My "other" project - the shepherd's hut
A busy time of it, despite the weather which has been dreadful. It has rained pretty much all day every day for a fortnight now. I wish I were building an ark instead! So, I haven't been able to finish the outside until today when it stayed dry all morning - long enough for me to finish the wriggly tin cladding - apart from the edge pieces which I have ordered but which I shan't collect until Monday. I also got the window glazed at the end over the bed and started fiddling with the stove - in preparation for cutting a hole in the roof for the chimney.
During the week I got the floor laid and the bed in place as well as most of the skirting and dado rails which have now been painted.
So it now looks like this:
This is the bed frame - The last bit of cladding and the window glazed -
This is what the stove will look like. The flue is very thick because, in a wooden building the flue has to be insulated so it is what is known as twinwall, which has a layer of insulation wrapped round the inner flue itself. In fact there's a piece of chimney to the left of the stove so you can see the insulation.
As you can see, I still have the door and the steps to make.
In fact, it wasn't raining at this point, so I had taken everything out of the hut to lay the floor, but not the sheets to cover everything up quickly if (when) it comes on to rain.
Otherwise, most of what is left is the detailing. So, we're getting there, but, tomorrow I have a nice trio to Newbury!
During the week I got the floor laid and the bed in place as well as most of the skirting and dado rails which have now been painted.
So it now looks like this:
This is the bed frame - The last bit of cladding and the window glazed -
This is what the stove will look like. The flue is very thick because, in a wooden building the flue has to be insulated so it is what is known as twinwall, which has a layer of insulation wrapped round the inner flue itself. In fact there's a piece of chimney to the left of the stove so you can see the insulation.
As you can see, I still have the door and the steps to make.
In fact, it wasn't raining at this point, so I had taken everything out of the hut to lay the floor, but not the sheets to cover everything up quickly if (when) it comes on to rain.
Otherwise, most of what is left is the detailing. So, we're getting there, but, tomorrow I have a nice trio to Newbury!
Re: My "other" project - the shepherd's hut
Hi Fred,
are you shure that the oven is „big enough“ to warm up the hut if you have the flue insulated?
But again: very very nice project
Steve
are you shure that the oven is „big enough“ to warm up the hut if you have the flue insulated?
But again: very very nice project
Steve
It's supposed to look like that, it's crochet...
- removeduser185
- Cake Guru
- Posts: 3531
- Joined: Thu Jun 18, 2015 10:37 pm
Re: My "other" project - the shepherd's hut
I certainly hope so. According to the calculation based on volume of space to be heated it should need a stove capable of 1.5kW. This one is 5kW! It's probably bigger than it looks!
Re: My "other" project - the shepherd's hut
Glad you're getting on a bit Fred, despite the Welsh weather. If it's any consolation, it's not much drier in "semi arid" East Anglia. Which I could live with if it weren't for the fact I currently have a garage with no cladding and an extension with half a roof!
Cheers
Steve
Cheers
Steve
57 KB 58 1983 SIII GS Lightweight
- removeduser185
- Cake Guru
- Posts: 3531
- Joined: Thu Jun 18, 2015 10:37 pm
Re: My "other" project - the shepherd's hut
Ok Fred, if it really has 5 kw, then it should really be big enough
It looked so small to me
Whishing warm hours in your Hut,
Steve
It looked so small to me
Whishing warm hours in your Hut,
Steve
It's supposed to look like that, it's crochet...
- removeduser185
- Cake Guru
- Posts: 3531
- Joined: Thu Jun 18, 2015 10:37 pm
Re: My "other" project - the shepherd's hut
Not raining first thing, so I excused myself from dog-walking in order to make the hole in the roof for the chimney. So what happened? It pissed down - just after I'd made the first cut. So there I was, at the top of a ladder with a mains-powered Dremel in my hand and the rain running down my neck. It got so bad I had to stop, so I hastily covered the hole with masking tape and went off to the garage to finish painting the fascia and barge boards. So it dried up - as long as I stayed in the garage. Every time I emerged... it pissed down again. Eventually, though, I succeeded and this was the result:
With that done things began to dry up a bit and, after lunch, I was able to put the edge pieces on the sides of the outside cladding to finish the wriggly tin. You can see one of them resting on the ground, but in the right place, in the photo of the hut above.I was amazed - I got these made up for me - 4 of them each of 3"x7'6" right angle in PVC-covered galv - a fiver!
Then I painted the overhangs under the eaves and allowed the stove to warm through and cure the cement. No leaks and the hut was as warm as toast despite it being a very small fire and the hut having no doors! So, all being well, tomorrow I will fit the barge boards and fascia which will finish the outside. Then there is the rest of the wall and ceiling which had been left off until the chimney was in place, the doors and steps.
With that done things began to dry up a bit and, after lunch, I was able to put the edge pieces on the sides of the outside cladding to finish the wriggly tin. You can see one of them resting on the ground, but in the right place, in the photo of the hut above.I was amazed - I got these made up for me - 4 of them each of 3"x7'6" right angle in PVC-covered galv - a fiver!
Then I painted the overhangs under the eaves and allowed the stove to warm through and cure the cement. No leaks and the hut was as warm as toast despite it being a very small fire and the hut having no doors! So, all being well, tomorrow I will fit the barge boards and fascia which will finish the outside. Then there is the rest of the wall and ceiling which had been left off until the chimney was in place, the doors and steps.
- removeduser185
- Cake Guru
- Posts: 3531
- Joined: Thu Jun 18, 2015 10:37 pm
Re: My "other" project - the shepherd's hut
What have I been up to lately? Well, the bed is in and the soft furnishings are starting to arrive - the curtains, blinds, bedding and so on.
I have made a set of steps
and started the door frames
and done a bit of tidying inside, finishing the roof, touching up the paint and so on.
and started the door frames
and done a bit of tidying inside, finishing the roof, touching up the paint and so on.